Frame
Top Mat
Bottom Mat
Dimensions
Image:
10.00" x 7.00"
Mat Border:
2.00"
Frame Width:
0.88"
Overall:
15.50" x 12.50"
Nyc Subway Construction, 1906 Framed Print
by Science Source
$118.00
Product Details
Nyc Subway Construction, 1906 framed print by Science Source. Bring your print to life with hundreds of different frame and mat combinations. Our framed prints are assembled, packaged, and shipped by our expert framing staff and delivered "ready to hang" with pre-attached hanging wire, mounting hooks, and nails.
Design Details
Stop on the original Broadway line at 181st Street under St Nicholas Avenue. Workmen were finishing installation of ceiling lamp fixtures, inspiring... more
Ships Within
3 - 4 business days
Additional Products
Photograph
Canvas Print
Framed Print
Art Print
Poster
Metal Print
Acrylic Print
Wood Print
Greeting Card
iPhone Case
Throw Pillow
Duvet Cover
Shower Curtain
Tote Bag
Round Beach Towel
Zip Pouch
Beach Towel
Weekender Tote Bag
Portable Battery Charger
Bath Towel
Apparel
Coffee Mug
Spiral Notebook
Fleece Blanket
Tapestry
Jigsaw Puzzle
Sticker
Framed Print Tags
Photograph Tags
Comments (0)
Artist's Description
Stop on the original Broadway line at 181st Street under St Nicholas Avenue. Workmen were finishing installation of ceiling lamp fixtures, inspiring some straphangers to call it "Chandelier Station". The IRT Broadway-Seventh Avenue Line is a New York City Subway line. It is one of several lines that serves the A Division (IRT), stretching from South Ferry in Lower Manhattan north to Van Cortlandt Park-242nd Street in Riverdale, Bronx. Operation of the first subway began on October 27, 1904, with the opening of all stations from City Hall to 145th Street on the West Side Branch. Service was extended to 157th Street on November 12, 1904, as the station was delayed because there was still painting and plastering work going on in the station. The West Side Branch was extended northward to a temporary terminus of 221st Street and Broadway on March 12, 1906. The original system as included in Contract 1 was completed on January 14, 1907, when trains started running across the Harlem Ship Can...
There are no comments for Nyc Subway Construction, 1906. Click here to post the first comment.