Use code RJTJFG for 20% off at checkout. Until 5/31/20
Boundary: Bleed area may not be visible.
The watermark at the lower right corner of the image will not appear on the final product.
by News Bureau, General Electric Company
$17.00
Size
Image Size
Background Color
Product Details
Our ceramic coffee mugs are available in two sizes: 11 oz. and 15 oz. Each mug is dishwasher and microwave safe.
Design Details
Fuel elements are loaded into the core of General Electric Company's Vallecitos developmental boiling water reactor, which today produced steam for... more
Dimensions
11 oz.
Ships Within
5 - 7 business days
Photograph
Canvas Print
Framed Print
Art Print
Poster
Metal Print
Acrylic Print
Wood Print
Greeting Card
iPhone Case
Throw Pillow
Duvet Cover
Shower Curtain
Tote Bag
Round Beach Towel
Zip Pouch
Beach Towel
Weekender Tote Bag
Portable Battery Charger
Bath Towel
Apparel
Coffee Mug
Yoga Mat
Spiral Notebook
Fleece Blanket
Tapestry
Jigsaw Puzzle
Sticker
"Fuel elements are loaded into the core of General Electric Company's Vallecitos developmental boiling water reactor, which today produced steam for this country's first all-privately financed atomic power. Steam produced was supplised to a 5,000-kilowatt turbine generator installation built by the Pacific Gas & Electric Company. Electricity produced was fed into a PG&E transmission system for use in northern an central California. The historic nuclear power plant was completed in a year and five months, believed to be a record for construction of an atomic power plant."
$17.00
There are no comments for Vallecitos Nuclear Center, C. 1960. Click here to post the first comment.